1 篇已发布文章 · THG
THACO (THG) approved to study a 103km Da Nang-Chu Lai urban rail project worth ~VND 266,000B ($10.6B USD). Construction could start Feb 2027, with operation by 2032.
所有信息仅供参考,不构成投资建议。过往表现不代表未来收益。数据来源于越南公开市场信息。
最后更新: 2026-04-23T08:22:00.873286.
About · Methodology